-This is a 77 year old male who came to the ER with complaints of having crampy, abdominal pain for several days, which then became worse.
- An x-ray was taken of the abdomen and showed distention of the right colon
- a colonoscopy was done and showed that he had diverticulitis with colon obstruction
- He was then schedualed to have a Sigmoid colon resection and colostomy.
-He has a history of high cholesterol, type 2 diabetes, cholecystectomy, abdominal hernia repair, left leg fracture.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment